A metals business, a proposed mine reopening and a domestic supply-chain argument needed to add up to one proposition. Pitchwave shaped the presentation narrative so investors, partners and public-sector stakeholders could understand how the pieces connected and why they mattered.

Pitchwave’s role

Narrative structure · Content organisation
Visual communication · Presentations

To protect client confidentiality, these illustrative examples use fictional names, figures and project details. They are not original client slides.

01 / Establish the strategic need

Explain why the
capability matters.

The story placed the business in the context of domestic supply, import dependence and defense relevance. That framing gave people outside the metals industry a reason to engage with the technical and commercial detail.

Forge / Strategic rationale · Illustrative01

A domestic ferrochrome platform

A proposed 25,000-tonne-per-year ferrochrome line, designed to add a domestic conversion route for qualified industrial buyers.

Stabilised production target

20,000 tonnes per year

25,000 tonnes of nameplate capacity × 80% utilisation. Product basis: 65% contained chromium.

Commercial qualification target

12,000 tonnes / 60% of output

Three customers at 4,000 tonnes each. The remaining 8,000 tonnes are available for spot and additional qualified sales.

Industrial facility and stacked metal stock
Development ask$30m / 24-month programme

Retrofit an existing industrial site, qualify feedstock and prove repeatable output. Customer volumes are targets; no offtake is assumed to be signed.

02 / Connect the platform

Make the pieces
work as one argument.

The narrative connected the proposed mineral resource, ferrochrome manufacturing and recycled-aluminium process. Clear relationships helped readers understand the industrial logic, while keeping the role of each part visible.

Forge / The industrial platform · Illustrative02

A feed plan that matches the output

Molten metal being poured into a mould
  1. 01

    48,000 t feed

    Annual concentrate requirement at 44% Cr₂O₃

    Purchased feed for ramp-up; domestic source qualification in parallel
  2. 02

    25,000 t line

    Annual nameplate alloy capacity

    90% chromium recovery assumed through preparation and reduction
  3. 03

    20,000 t alloy

    Annual output at 80% utilisation

    65% chromium grade; 13,000 t of contained chromium
Reduction-stage inputRecycled aluminium

Qualified chemistry; dosage set by charge trials

Chromium balanceFeed supports ≈20,000 t of alloy

48,000 t × 44% Cr₂O₃ × 68.4% chromium content × 90% recovery ÷ 65% alloy grade. Rounded to the 20,000 t operating target.

03 / Build the case for backing

Give the next step
a basis in evidence.

The presentation series brought technical capability, development milestones and the strategic case into a sequence for investors, partners and government stakeholders. The distinction between completed work and future plans matters: readers need to see both the starting point and the commitment being considered.

Forge / The case for backing · Illustrative03

$30m to reach commercial readiness

Metal granules used as an illustrative material referenceMonth 24 acceptance target

1,667 tonnes per month

Three consecutive months near this run rate, plus three customer approvals, support the 20,000 t annualised target. This is a future gate, not current production.

Uses of funds / $30.00m total
Workstream / allocationShare of fundingDelivery milestone
Plant retrofit / $18m60% of the funding requestM1–18: engineering, equipment and installation
Feed qualification / $4m13.3% of the funding requestM1–12: assays, supply trials and domestic resource studies
Ramp-up / $3m10% of the funding requestM18–24: test lots, customer qualification and working capital
Contingency / $5m16.7% of the funding requestHeld against equipment, schedule and commissioning overruns
Commercial gateQualify before committing volume

The 12,000 t customer target depends on product acceptance and signed contracts. Full-year 20,000 t production follows ramp-up; it is not cumulative output during the programme.

What the team received

A strategic story
across the presentation series.

Materials connecting the industrial platform to its commercial and strategic significance. Pitchwave organised the content, shaped the argument and developed the visual communication so the individual assets could be understood as parts of a larger case.

The work provided a basis for explaining the platform to audiences with different levels of technical knowledge and different reasons to consider supporting it.

Have a case to make?

A complex business.
A wider audience.

Bring the technical material and the decision you need people to understand.

Start a conversation
Next case / 01Arevia Power Energy infrastructure