I could use help with Optional

I usually reply within one or two business days.

Arevia Power / Energy infrastructure

Making a complex energy opportunity easier to assess.

A powered-land opportunity brings several questions into one conversation: the site, its infrastructure, the commercial terms and what needs to happen next. For Arevia, Pitchwave took on the research, narrative and presentation work needed to bring those pieces together.

Pitchwave’s role

Research · Narrative · Writing
Custom maps · Presentation design

To protect client confidentiality, these illustrative examples use fictional names, figures and project details. They are not original client slides.

01 / Establish the opportunity

Give the reader
a starting point.

The presentation opens with the project and the immediate requirement, then moves into the site details. That sequence gives the reader a frame for the technical information: what is being proposed, what matters now, and what supports the case.

Juniper / Illustrative development01

Juniper
Energy Campus

Two 200 MW computing phases on one site, with a combined 500 MW facility power requirement.

Total facility load
500MW
Site area
320acres
Build-out sequence

Phase 1: 200 MW IT / 250 MW facility.
Phase 2: the same capacity added at build-out.

AI-generated view of a fictional undeveloped desert site with distant mountains and transmission lines
Immediate next stepLoad-study application

Request 250 MW for phase 1 and a study of the full 500 MW build-out.

100 MW of the full load is reserved for cooling and other facility systems. Utility capacity is not yet allocated.

02 / Connect the infrastructure

Make the location
part of the argument.

A location label alone cannot explain an infrastructure opportunity. Custom maps bring the site boundary, transmission and regional connections into view, so the reader can follow how the site relates to the systems around it.

Juniper / Illustrative site plan02

The site and its connections

Juniper site and indicative infrastructure connectionsFictional schematic, not to scale. A highlighted 320-acre study area lies between an indicative power connection to the northwest and a regional fiber corridor and access road to the south. No actual site or routes are shown.Juniper site320-acre study areaRegional substation2.4-mile study routeRegional fiber corridorAccess roadSCHEMATIC / NOT TO SCALE
Site boundaryPower connectionFiber corridor
01 / Site position

320 acres

200 acres for campus pads, 60 for utilities and roads, and 60 for setbacks and drainage.

02 / Power

2.4-mile power route

230 kV connection under study. Two 250 MW phases; 500 MW at full build-out.

03 / Connectivity

0.6-mile fiber spur

Two campus entries proposed. Carrier availability and end-to-end route diversity remain to be verified.

Key dependencyUtility confirmation

The first phase uses half the planned facility load. The full 500 MW depends on utility studies and network upgrades.

Illustrative relationships only; no actual site or routes are shown.

03 / Clarify the commitments

Let the terms
be examined.

The commercial structure needs careful reading. The option terms are organised in a table, while power supply and interconnection are explained separately. Each part has a clear place, helping the reader work through the proposition without losing the conditions behind it.

Juniper / Illustrative commercial terms03

Option structure & economics

Proposed purchase option
Illustrative terms
Twelve proposed commercial terms for the fictional Juniper Energy Campus. All amounts and conditions are illustrative.
TermCommercial basisTiming / qualification
Agreement statusDraft purchase optionExecution starts the 48-month term
Option term48 monthsExercise notice due before expiry
Property320 acresEntire Juniper site
Price per acre$75,000Fixed for the option term
Total purchase price$24,000,000320 acres × $75,000
Option payments$100,000 at execution; $200,000 at month 6$300,000 at months 12, 24 and 36
Purchase-price credit$1,200,000 over the full term100% credited; paid fees are non-refundable
ExerciseWhole propertyNo partial parcel acquisition
Due diligence / permittingBuyer funds studies during the optionExercise depends on buyer satisfaction
ClosingWithin 90 days of exerciseSubject to agreed closing conditions
Water rightsSeparate arrangementNot included in the land purchase
Mineral rightsSeller-owned interests onlySubject to title verification
Payment treatment$22,800,000 at closing

Full-term example: $1.2m paid during the option + $22.8m at closing = $24.0m total land consideration.

Earlier exercise credits only fees already paid. Closing costs and separate water arrangements are additional.

What Arevia received

A presentation built
around the whole opportunity.

The delivered deck brought the project overview, site information, infrastructure, commercial terms and next-step requirements into one sequence. Pitchwave’s contribution extended from researching and organising the content to writing the presentation and designing its maps and slides.

That gave the team a prepared basis for explaining the opportunity and working through its details in project conversations.

Have a case to make?

Complex project.
Important conversation.

Bring the material you have and the decision it needs to support.

Start a conversation
Next case / 02Rilea Group Real estate